Time flies when you are having fun. But that does not finish the bathroom. So after putting in the last tiles a few weeks ago, it was time for the grouting, which again was a finishing touch.
Next up was the ceiling and the indirect light. I made a combination of the lowered ceiling and a place to connect the vertical part that will hold the LED strips.
In the mean time all stores are closed due to corona, but luckily ABC already had a web shop and they offered the option to pick up the order from the store.
Spelling error report
The following text will be sent to our editors: