Wall and floor work at the office

The good thing about such a project week, is that it motivates again to pick up the bigger projects. So I continued on the attic which will be my office.

Finishing the inside of the Velux window is another one of those big changes.
There was still one piece of floor board that needed to be placed, but since I wanted to organize the heating pipes a bit better, as there is a difference between pipes on an attic and in an office, I had postponed that.

It was great to see the improvement of the organization. All nicely next to each other, it looked nice and neat. Although I did think I should make a box around it, both for insulation and so I could easier put a cabinet on top.

Next up was the outside wall. Building a frame, putting plaster board against it and finishing off around the window. Very rewarding. Yet after that I did not do anything worth mentioning until the end of March.

If you have found a spelling error, please, notify us by selecting that text and pressing Ctrl+Enter.

Spelling error report

The following text will be sent to our editors: