The hallway

After playing around with the ESP replay, I dug up an ESP AI-TInker from my parts box to try to flash it. Unfortunately this did not go as smooth as I wanted. Oh well, no direct need for it, but would have been fun to finally have some software running on it.
Later in the week I finsihed the plaster plate around the front door. Suddenly it looks so much more done. After that I set up the scaffolding Jan had stored under the train roof in the hallway. This way finishing the ceiling in the hallway went very easy, at least for the reachability of the ceiling. It still was a lot of measuring, remeasuring and cutting to get the ceiling in, but the result was satisfying and the lights we bought weeks ago also look great.

If you have found a spelling error, please, notify us by selecting that text and pressing Ctrl+Enter.

Spelling error report

The following text will be sent to our editors: