Second layer and garage cleanup

The 3D-printer was standing on the floor in my office. That had to change, online I saw a lot of people use Ikea’s Lack table to put it on and there are plenty of little hacks you can print for it as well. So of to Ikea.

While there I found the Hornvallmo blackout curtains, which would likely be a good solution for the bedroom, as the support rails guide it nicely next to the glass so no movement through a draft and to be opened from the top and/or the bottom. At home I measured and we decided we should take them on a next trip to Ikea.

The second layer of paint on the house took way less effort. It was a joy to paint and the result was amazing. It seems 2 layers will be enough.

Toward the end of the month Marc had ordered an olympic barbell and 177,5 kg of weights. I had seen a squatting and bench press rack on the Wise marked place and after consulting with Mo, we decided this would be nice birthday present for the boys, as it is always hard to find something for them. But where to place the rack…

A good reason to clean up the garage and create a little gym area in the back. For now we put a leftover piece of linoleum, but I guess at some point some rubber mats would be better.

If you have found a spelling error, please, notify us by selecting that text and pressing Ctrl+Enter.

Spelling error report

The following text will be sent to our editors: