Plastering and bathroom works

With another room fully plaster-plated I thought it would be a good time to get some rotband and fill the space between the plates and the screw holes. The coarse structure works fine for the big gabs between the plates and fill the big gab next to the toilet door, but it sure will need some finishing after that.
To be ready for the upcoming colder season, I wanted to put in the bathroom window properly. This was a nice job after a workday.
In the weekend it was time to get some time back from Gorden who I helped out with his bathroom tiling a few weeks ago. I thought it was fitting to work on our bathroom with him. I wanted to work on a lowered ceiling with indirect light from the edges.
Work progressed very slowly as every piece we put up had to be measured individually as the ceiling was not level in any direction. The laser really helped out nicely here. At the end of the day the edge around the ceiling was the only thing that was actually finished. Not very satisfying but still work that needed to be done.
On Sunday I spend more time trying to find the last small leaks on the roof. While that close to the roof I filled some cracks with PU foam as preparation for the insulation works.