With all the floor heating in, it is time to get the side insulation in, so the concrete has some space to expand. I also still needed to make a wooden frame around the chimney. This was one of those jobs that took way more time then you would imagine.
In the mean time my dad took off the old layers of the wall and floor.
Spelling error report
The following text will be sent to our editors: