Now that we found the right colour, it was just a matter of putting it on the rest of the walls. With the white base coat it worked easy and every finished wall convinced me it was the right colour. For the final touches like the skirting boards and finishing slats I need to get a router, but after 5 weekends of 25% discount at ABC this weekend there is no discount, so a bit of patience. Good thing there is plenty of other jobs still waiting.
One of the things I had pushed forward for a while already was to rewire the pumps of the heating system. For some reason they where connected directly to the mains, so they are all running 24/7. The heater has been designed to also control the pumps so it can also prioritize the hot water to either the boiler or the heating systems. I discussed changing this during the last visit of a mechanic and now I finally did it. Likely the big difference will be noticed when the weather cools down again, so that will take a while.
Since the first patches of our vegetable garden where easily filled we decided to clean another piece for beans and peas. So lots of time consuming sifting of dirt, but with the weather getting nicer and nicer it is good to be outside.
In the weekend Mattias and I put in the plaster plate on the ceiling for the second bedroom. So nice to see the big changes a bit of plaster plate can bring to a room.
Spelling error report
The following text will be sent to our editors: