This week is the last week before the summer vacation for the higher education, that means Rika, Marcs girlfriend will come over and they would like to stay over, a nice deadline to roughly finish the second bedroom and the stairway. So building and covering more walls, plastering the ceiling (where Marc did a great job), painting the ceiling and laying the floor.
On Saturday we had a new error on the heating system: E44/E45 Draft. So I checked the parts that seemed logical to me, but could not find a direct reason. I did however notice the chimney was pretty black and it would not hurt sweeping it, so I went to ABC to get some chimney sweeping materials. I was pretty impressed by the amount of sooth I took out. I guess about 3-4 liters from the 4 meter pipe from 11 months of use. The sweeping itself was rather easy, so I guess I can do it a bit more often as a preventive measure.
In the mean time Pelltech had replied to my question on how to solve it. It turned out that besides the chimney one of the fans had also a significant sooth buildup. After cleaning that, everything worked as expected again.
Learning from the past I got enough floor boards so it even would fit the extra piece of floor that needed to be covered under the roof. By Sunday night the floor was done, just in time to have a guest room. I just needed to get doors.
Spelling error report
The following text will be sent to our editors: