The start of the kitchen

The floor is in place, that means, we can finally start to build the kitchen!
Although, it has taken some effort to get to that point, as not all parts of the kitchen where in stock in Estonia. After a few weeks of waiting, I started to look for alternatives. Good thing Jan was in the Netherlands with our trailer and I found out he still had some space, so I ordered the missing cabinets and the cooking hub from Ikea Delft, Ramona picked it up and dropped it off and then Jan drove to Estonia. So finally we could at least build the lower part of the kitchen, so we could have the counter top measured, as that would also take another two weeks to arrive.

But first things first, I had to waterproof the seams in the linoleum, so after work I picked up a special toolkit to do this. The manual was not very clear and it turned out the thermostat of the tool was to high, so the first seam did not turn out very nice, good thing it is the one under the cabinets. The rest went pretty smooth and the result was nice.

During the weekend we put up the cabinets. Since I wanted to have a 70 cm countertop and not the standard 60 cm, all cabinets had to stand 10 cm from the wall, so I had to come up with a way to secure them to the wall. With some different brackets, I came to the perfect solution.

And then finally, it was time to paint the kitchen wall. We had picked a special kitchen paint, that can be washed, se we did not have to put in tiles. The result of the first layer was great! This really is going to be a nice kitchen!

A ceiling and a kitchen floor

All the preparations are done, time to rent a plaster plate lift and put in a ceiling. Of course all the lifts where rented out at the Ramirent around the corner and also in the other Tallinn branches there was no lift left over. Good thing there was one in Keila, so a little drive through the beautiful Estonia landscape and we could start anyway.

With the lift, putting in these huge ceiling plates was a breeze. We where done before we knew it. To to do some plastering. Well a lot of plastering. And then after some sanding it was time for a coat of paint. I figured Ral 9010 would be a good colour.

With this work done, the next step was to put in the linoleum in the kitchen. There was an annoying surprise when we found out they had cut the role just a few cm short. But after a bit of measuring and rethinking the way we could lay it we made it work. It was a fun new skill to learn and the result was super!

Now we could pick a colour for the kitchen wall. We picket an egg yellow, and could hardly wait to put it on.

Redoing the living room floor

The first project my dad and I planned to do was to redo the floor, straighten it out an take out some of the of the movement we noticed in some spots. We planned to replace the OSB for a thicker version, but with the prices being threefold of last year, we decided on different solution.

First we took out the floor and then we had to find the highest and lowest point of the floor. With the laser and a pole this was relatively easy. We found the difference throughout the room was about 5 cm. Especially in the middle of the room the beams seem to have bend over the years.

We got straight wood and screwed this to the sides of the original beams. In between we place cross beams to strengthen the floor boards. After this was done in the kitchen area, we got the hang of it. After about 6000 screw the more expensive Makita screw bit was warn out. It sure proved it was worth the extra money. All in all it still took almost a week to replace the floor, but the result was very satisfying.

The next step was to create an air duct for extraction hood in the kitchen. After some careful consideration we create it with 1 90 degree angle in it so the exit would be a bit away from the roof, as in the winter snow would otherwise block the exit.

As I wanted to have gallery rails to hang painting from to be flush with the ceiling, on other job this week was to put these at the correct height. This made me realize it might be a good idea to run some cables to the windows in case in the future I want to create automated curtains. A small job now, hopefully it will be useful in the future.

Towards the weekend we got a message from Ikea that most of the kitchen was in. With a bit of logical loading the van held the entire kitchen and even had a bit of left over space.

Bathroom and summer kitchen

The first thing to finish was the bathroom ceiling. The majority of the work was done already, only the main ceiling had to be put in, plastered and painted. This went pretty smooth.
In between we moved the temporary kitchen to the garage and made it into a pretty cozy kitchen. The only thing missing was running water and a sink, but this was fixed with a the vacation jerrycan and a bucket. It is temporary anyway. Soon we will be able to use a real kitchen.
Finally we could also put in the cabinet in the bathroom. At first I thought of building a cabinet, but when I found out it would fit a stock cabinet from Ikea with matching wooden doors, the choice was easy. Just in time for the arrival of my dad. It was good seeing him again in Tallinn. Looking forward to all the work we have planned.

The first thing we planned to do was take out the floor in the living room/kitchen and make it completely level. So taking out all the floor boards again. Minor detail was then we had build the insulation and walls over the floor, so we had to cut the floor. My old cheap jigsaw broke, so time to replace it for a real one. For some parts this was not the best solution either, so we also got a little circular saw blade for on an angle grinder. A scary tool that got the job done nicely.
With the floor out, we had to find out how big the difference was. After a lot of measuring we found out the difference between the highest and lowest point of the floor was almost 5,5 cm. No wonder the floor was wavy. We put in screws at the measuring points to visualize what we needed to fix and decided to screw some straight beams against the sacked beams.

Ready, set: GO!

This first decent vacation since we got the house has done us good. We rested, got inspired and were ready for a big large sprint. On a rainy day in France we went to Ikea and made the last decisions about the kitchen, so we where ready to order it.
It had been hot in Estonia, actually this region has been the hottest in entire Europe. Those small tomato plants we left a month ago, turned into a huge tomato plant jungle, which Mo cleaned up nicely.

After that it was a week of visiting a lot of shops. First stop was Ikea to check some final details and double check if everything we picked was also available in Estonia. Than we went for Floorin as I though linoleum might be a good solution for the kitchen. Mo’s first response was something like ‘No way!’ Ben when she saw the modern colours, she agreed to check it out and after seeing it in real life the decision was made quickly. We also found some roles of heavily discounted linoleum in the colour chartreuse, which we thought would be nice for the hall way. Nice detail was we brought a bottle of Chartreuse from France and it is clear how the colour got it’s name.

Next was a few countertop specialist, the good thing of have two offers is, you can negotiate prices. Since the first company we checked couldn’t beat the price of Granimar the order went to them.

For the living room we wanted a wooden floor. After earlier success at K-Rauta we went there and also this time we found a floor we liked quickly. As a bonus we also found a vanity desk for in the bathroom that was on sale, so we took that as well.

With these preparations done, we could start the real work. We wanted to try to get the bathroom done before my dad would arrive. It was just the ceiling, starting with plastering it.

And since we would replace the entire floor in the living room/kitchen we also needed to make space there, so we cleared out the garage to create a temporary kitchen there.

Last week before the vacation

The birthday party was a great success, even though it was the first rainy day in weeks, but under the train roofs we had a good place to sit with a nice group of people. I had asked for rock garden plants and people sure brought them. So to keep them healthy I planted them in the side garden, so there would not be to much care for them during our vacation.

Another thing on the checklist was the annual test for the car, since the deadline would be half way our vacation I took care of it before the vacation. It turned out one of the test stations is literally at the end of the street, so when I was waiting in line I could walk home and get some stuff. When it was my turn the car was inspected and apart from a few minor problems, like a few small lights it was ok. Turned out I could fix them later and the car was good to go for another year. Way more pragmatic as in the Netherlands.

In the 17th we’ll leave for France, so the next update is after we come back. My dad will come over to help out. We are planning to work on the living room and kitchen.

From car to simple camper

Time is ticking and soon Mo will have her last day at work and the day after we can leave for a vacation to France. The plan is to turn the van in a simple camper with as much comfort as possible in a small space.
I put in the chemical toilet, a jerrycan for water, a washing bowl and a fridge. They just fit next to each other. Behind it a full mattress of 1m40 x 2m fits exactly.
Together with Jan we build the woodwork around it. From some thin triples I make replacement panels for the doors and like the the camper is almost done.
Time for a birthday party!

Spring cleaning in the garden

As I mentioned last week, I finally knew something for my birthday: a brush cutter. Both my dad and Mo’s mother sponsored this gift and it was great fun to clean out the parts of the garden with way to high weeds. I also cleaned the outside of the fence and the gutter next to it. A huge improvement.

Next to the new greenhouse was an old bathtub. It was pretty much in the way their and we figured it would be nice to move it under the corner of the garage roof to collect rain water. So some digging and than moving this heavy monster and placing it in the hole. With the help of Mattias it went pretty smooth. The dirt that came out of the hole could be used next to the green house. Meanwhile Mo cleaned up around the well and like that the garden had gotten a nice spring cleaning.

Garden

It has been a busy week, so little work on the house. We did a bit of gardening. More and more flowers are showing their beauty. During the weekend we are going to check out a tulip festival. Unfortunately, we were pretty late in the season, as a bit more south the tulips where almost done, while in the garden they are at their prime.
But on the bright sight, the place had a semi botanical garden with a lot of rock garden plants, so I could show Mo some of the plans I had for part of the front yard.
And due to a question of Mo’s mother, for the first time in years, I know something to ask for my birthday. So I order it and it should be available next week

Work on the car

During the week the 2 din Android radio from AliExpress came in, so time to put that in the car. It turned out a nice puzzle of wires to sift through, find the right connections and adapters. Since the antenna was broken I also needed to replace that, good thing there was a nice affordable replacement especially for this type of car, but at home I found out it also needed another adapter. So I had way to many trips to the car part store. Good thing it is around the corner.

After the radio was working I started measuring the drawers it had made for my Berlingo before to fit them in the back of the car. That will work out nicely. Something for next week. Also I started checking the second hand market for better tires and roof bars for the rooftop tent.