After a week of very visible work a week of less noticeable work followed. I finished the driveway outside of the gate, but then I went back into the garage and worked on the workbench. When I dry fitted all the joints I was impressed by how sturdy the workbench was already. I was looking forward to gluing it all together.
I also wanted to close the wall in the garden shed that has been build on the back of the house as there is still some cold air seeping in. For the bathroom I had taken out half of the windows, so there was a spare part on both sides of the window on the outside. While doing this, I noticed the part of the wall under the window was pretty crooked, so the result was not perfect, but good enough for a shed.