Connecting the inverter and repairing the sauna

My goal was to get the solar panels connected to the grid before the end of the year. So still some work to do. Once the new cable to the electricity meter was connected, a project in which the meter was also finally moved to the final position in the meter closet, I could start connecting the inverter also. Fronius has great instruction videos online on how to do it, even though it pretty straight forward to begin with.

Once the inverter was online I set it up, enabled the API and connected it to Home Assistant. The next day it started spitting data which I then displayed as nice graphs.

With that done, I decided it was time to do a bit of service and repair work in the sauna. After three year a few of the stones started to come loose, so I got a different glue. When I started to take of the loose stones from the top, I soon found out it would be a bit more work then the few I thought where loose, around 80% of the stones came loose without any effort, so I took them out and after that glued them back in place. I now also could finally glue the stones in front of the chimney and on the other side of the chimney put the last wood.

In the kitchen I placed the chimney of the extractor hood, I put insulation material in it but it was still much noisier then we had hoped. Let’s see if at some point I can come up with an idea to improve that, as now it is not a nice hood to use.

Lots of stuff done

The weather is still good, and I want to have to solar panels on the roof before winter. Partly because this part of the roof still has some leakage at odd times. Besides it would be nice to have them online before January, so I will have a good start of the annual data.
We first took off half of the roof, the part that bordered the neighbors. Here would be normal roofing.
Dressed up in overalls, PF3 masks and gloves we took of the asbestos roof plates. The nails that where used came out surprisingly easy and there where no breakages. This went quicker then expected.
Under the asbestos there was asphalt. To take that off took way more time then anticipated. It seemed nail where free in the Soviet times, they used so many!
When the roof was clean, we placed the vapor barrier and the distance holders. On top of that the horizontal planks and after two days of work this part was ready for the new roof. Another two days later the roof was on and if looked fantastic! The neighbor was also very enthusiastic.

The next weekend I worked on some electrical things for the home automation without very much success and I finally placed the kitchen light in the final position.
Mo found a place that was willing to make a custom extractor hood chimney. In Tartu of all places.

The weather forecast was good again, so we decided to replace the next part of the roof that would hold the solar panels. It was easier because we did not have to work around the dormer, but connecting the panels and routing the wires took more time, so all in all it took another 4 days get the solar panels up. The roof looks absolutely amazing!

Before the winter would come in, I also upgraded the chicken coop with a door to make it easier to get in and out.

Changing around a door and light

Ever since we moved into this house it boggled me how the door of the living room and the studio constantly bumped into each other. With the kitchen and living room mainly done, the hallway would be next. The first thing I picked up was the door of the studio. With a bit of checking out how it was put in, it was pretty easy to take out the frame as well.

When this was done I turned it 180 degrees and put it back in. This sure is one of the things that when it is done you ask yourself why you have not done this before. It made total sense and it felt like it never had been any different.

The last thing missing in the kitchen was the light over the counter. The missing piece was a wire between the adapter and the lights. It has a very specific connector, so it would not be easy to connect the otherwise. After enough patience and checking on several European Ikea stores, I found them in Berlin, so I contacted a friend in Berlin to get a few wires and send them. They finally came in and this really finished the kitchen. Not a week to early as the night are starting early these days.

Some repair work and more Ikea stuff

Fall is taking over summer. With it comes stormy weather. Some of the fences need some attention.

Besides there was another email from Ikea. Finally the pull out fitting for the corner cabinet came in. Installing that turned the cabinet into a useful cabinet where our pots and pans can be kept in an organized manner.

Finishing touches

Finally having a real living room feels so good. We really enjoy just sitting on the sofa, listening to music. Cooking in our real kitchen and having dinner on the table. We kind of took it easy a bit and relax.

Some of the small things we did was getting a induction adapter for the moka espresso maker Mo had gotten from Stefano. While we where at the wholesale store I had noticed these adapters, so when the moka maker did not work, I knew how to fix this.

Mo’s mother also gave us an old lamp with yellow details in the same colour as our kitchen wall. So we tried it and it seems to fit nicely.

And with the kitchen finished, we don’t have to do dishes in the bathroom anymore, so we could finally install the vanity desk in the bathroom.

The last fronts and a wooden floor

Finally Ikea send a message about the last fronts we where missing. So after picking them up, I could finally finish the kitchen. Well, almost finish as the cables for the counter lights are still missing. But it looks awesome! We also got new pots and pan as we now have an induction hub. I got them at the horeca wholesale store for a very nice price.

In the living room it finally time for the wooden floor and the painting of the stove with a special heat resistant paint (just in case we ever fire it up again). Mo does the painting and I am putting in the floor. A very productive day !

The countertop and fronts

After a week of fine tuning the plastered walls in the living room finally the phone call came in that the countertop was ready. Two people from Granimar came to deliver and install the countertop. It looked great and fitted like a glove. They had it installed in less then half an hour.

During the weekend we spend painting the living room walls and installing a few more fronts in the kitchen.

Because of the radiator the drawers under the ovens would not be able to open, so I changed the bigger drawer front for a door front and since there are not door fronts as narrow as a drawer, I bought a drill to create a hole for the hinges. When it was done it looked as if it was designed this way. Excited the kitchen really starts to get done.

Measuring and plastering

Now the cabinets have gotten their final place the countertop can be measured. The guy from Granimar came with er very nice tool to do the measurements. It is a box with a pen on a wire. Because of the wire it knows how far away from the box the pen is and because of the pressure from the wire it also knows the direction relative to the box. Apart from that there is a touch screen with some CAD software and in no-time the design was made. It should take 1-2 weeks to be ready.

During the week we have visited Ikea to pick up some new kitchen parts and double check some stuff in the showroom. We also found a nice mirror for the bathroom, which is part of our temporary kitchen.

On Sunday put a thin layer of plaster on the walls in the living room to make sure the surface has the same structure as we decided not to put fiber glass wall paper on the walls here. As there was the first Formula 1 race in Zandvoort this century on, I connected my laptop to a TV screen so I could follow it while working.

Slow building the kitchen

As with many things when renovating a house, you shouldn’t be in a hurry. Putting the kitchen together goes pretty quick, but then the details is where the real time is spend. To make sure everything was level and straight I ended up taking the different cabinets apart from each other and reattaching them. I had good help from Markus, a German guy we had met in France during our vacation who mentioned he was planning to visit the Baltics, so I had given my number and he actually showed up. Together it went pretty smooth and after that we had time to go into town.
Besides not having most of the fronts available yet, also doesn’t add to a satisfying feeling

Something else that wasn’t satisfying was the ceiling, the mud that connected the ceiling parts had dried in so much smaller during the drying process that it was very visible. It annoyed me very much, so I ended up filling it 3 more time before it was good enough, at least for now.

The start of the kitchen

The floor is in place, that means, we can finally start to build the kitchen!
Although, it has taken some effort to get to that point, as not all parts of the kitchen where in stock in Estonia. After a few weeks of waiting, I started to look for alternatives. Good thing Jan was in the Netherlands with our trailer and I found out he still had some space, so I ordered the missing cabinets and the cooking hub from Ikea Delft, Ramona picked it up and dropped it off and then Jan drove to Estonia. So finally we could at least build the lower part of the kitchen, so we could have the counter top measured, as that would also take another two weeks to arrive.

But first things first, I had to waterproof the seams in the linoleum, so after work I picked up a special toolkit to do this. The manual was not very clear and it turned out the thermostat of the tool was to high, so the first seam did not turn out very nice, good thing it is the one under the cabinets. The rest went pretty smooth and the result was nice.

During the weekend we put up the cabinets. Since I wanted to have a 70 cm countertop and not the standard 60 cm, all cabinets had to stand 10 cm from the wall, so I had to come up with a way to secure them to the wall. With some different brackets, I came to the perfect solution.

And then finally, it was time to paint the kitchen wall. We had picked a special kitchen paint, that can be washed, se we did not have to put in tiles. The result of the first layer was great! This really is going to be a nice kitchen!